Case Studies From Foundation Supportworks

Case Studies

Central States Manufacturing
A 53,600 square-foot structure, for the manufacture of metal roofing and siding, was planned for construction in St. Peters, Missouri. Approximately 18,000 square feet would...
Temporary Shoring Wall
A three-story, 77,000 square-foot medical office building was planned for construction in St. Louis County, Missouri. The east area of the construction site sloped upward...
Q Street Bridge Void Fill
Severe flooding of the Elkhorn River in Douglas County, Nebraska occurred during the spring of 2019 causing significant washouts at the Q Street bridge overpass. The high...
Four-Story Stair Tower
A stair tower addition to an existing four-story building experienced settlement not long after construction. The stair tower is approximately 53 feet high, 16 feet long and...
Farm Credit Services of America
A four-story office building was planned directly west of and across the road from the existing Farm Credit Service of America (FCSA) building in Omaha, NE. The new building...
Grain Silo Slab Leveling
The slab of a 60-foot diameter grain silo had experienced about 12 inches of differential settlement. The settlement caused the interior grain delivery augers and floor sweep...
St. Charles High School Building Addition
A building addition east of the St. Charles High School was designed to have concrete drilled shaft foundations near the existing building and shallow spread footings away...
FSU Doak Campbell Stadium
Florida State University planned to enclose the south end of Doak Campbell Stadiumto create the Champions Club Level which will offer over 5,000 premium seats, a70,000-square-foot,...
Papa John's Cardinal Stadium Expansion
Papa John’s Cardinal Stadium is an open-air football stadium which is home to the University of Louisville Cardinals. A $63 million expansion project was approved for...
TMH Cooling Tower Addition
A $400 million building expansion at the Tallahassee Memorial Healthcare facility included the installation of a new cooling tower on the roof of the existing utility building....
City of Tallahassee Public Pools
The Jack Mclean and Trousdell Aquatic Centers are part of the City of Tallahassee Public Pools system and have over 60,000 square feet of aquatic area. The concrete pool decks...
Fort Coombs Armory - Apalachicola, FL
The Fort Coombs Armory is located within the Apalachicola Historic District and was rebuilt in 1901 after being destroyed by fire shortly after construction in 1898. By 2017,...
Collins Hall Spectrograph
The Florida State University Physics Department planned to install a spectrograph in the basement of Collins Hall, which was constructed in 1959. The spectrograph design included...
Shaare Emeth Renovation
Renovation plans for the existing facility included the removal and relocation of an existing interior column. The new column location would be only a few feet from the existing...
Strip Mall Renovation
The “Villages of Twin Oaks” development project was planned southeast of the Big Bend Road and Missouri State Route 141 interchange. The new development would...
Total Case Studies: 196