
A three-story, 77,000 square-foot medical office building was planned for construction in St. Louis County, Missouri. The east area of...
A three-story, 77,000 square-foot medical office building was planned for construction in St. Louis County, Missouri. The east area of...
Severe flooding of the Elkhorn River in Douglas County, Nebraska occurred during the spring of 2019 causing significant washouts at...
A stair tower addition to an existing four-story building experienced settlement not long after construction. The stair tower is approximately...
A four-story office building was planned directly west of and across the road from the existing Farm Credit Service of...
The slab of a 60-foot diameter grain silo had experienced about 12 inches of differential settlement. The settlement caused the...
A building addition east of the St. Charles High School was designed to have concrete drilled shaft foundations near the...
Papa John’s Cardinal Stadium is an open-air football stadium which is home to the University of Louisville Cardinals. A $63...
Renovation plans for the existing facility included the removal and relocation of an existing interior column. The new column location...
The “Villages of Twin Oaks” development project was planned southeast of the Big Bend Road and Missouri State Route 141...
A ranch style, slab-on-grade duplex had a stable exterior foundation but poor slab support conditions on the interior. The worst...
The sidewalk surrounding the public restroom building at Northwest Park in Davenport, Iowa experienced differential settlement, evident by faulted slab...
The STEAM (Science, Technology, Engineering, Art and Math) Elementary School building, originally built in 1967, was planned to receive upgrades...