Case Studies From Foundation Supportworks

Case Studies Case Studies - Page 3

Stabilization for Elevator Excavation
Renovations to the Pasco County School District Offices included an interior elevator addition within one of the existing buildings. The proposed elevator shaft required excavating...
Science Museum of Virginia
The Science Museum of Virginia planned to open a new permanent exhibit called “Speed”. The centerpiece of this exhibit would be a full-size SR-17 Blackbird spy...
Private Boat Harbor - Naples, FL
A 216-foot-long by 60-foot-wide, L-shaped inlet waterway was planned at the site of a bayside residence. The proposed dredging would allow water from the adjacent bay to flow...
I-80 Bridge Departure Slab
The Nebraska Department of Roads (NDOR) was experiencing as much as two inches of settlement over a 100’ x 25’ section of bridge departure on eastbound Interstate...
Carlton Building Parking Garage
The second level of the Carlton Building parking garage was constructed half on grade and half above another parking lot. The area where the two halves joined had settled...
TDOT I-24 Settlement Remediation
The Tennessee Department of Transportation (TDOT) observed 1,700 feet of the eastbound center lane of Interstate 24 had settled as much as two inches. More concerning about...
I-80 Bridges - 56th to Waverly Interchange
Three newly constructed bridges on Interstate 80 showed significant settlement on the approach slabs within a relatively short time after construction. The pavement was in...
Brace Hall Floor Void Filling
Brace Hall is a 110 year old, three story structure sitting in the shadow of Memorial Stadium on the University of Nebraska campus. During recent renovations, the...
Buffalo & Pittsburgh Railroad
The Buffalo & Pittsburgh Railroad (BPRR) is a 368 mile long, class II railroad operating from Butler, PA to Buffalo, NY carrying commodities such as paper, petroleum,...
Delaware SR1 Pavement Leveling
The Delaware Department of Transportation (DelDOT) observed that three section-lengths of the southbound lanes of the Korean War Veterans Memorial Highway (SR1) had settled...
Jacksonville Bridge Approach
The Jacksonville Utilities Authority contacted Alpha Foundation Specialists regarding a high-traffic bridge approach which was experiencing settlement. An eight (8) to 12...
Elevated Conveyor Support
I.E.I. Barge Services planned for a new overhead conveyor system to extend from a proposed rail/truck receiving pit to two material handling buildings at the facility. The...
Westbrooke Village Apartments - St. Louis, MO
 New owners of a 250-unit apartment complex planned for a multi-million-dollar renovation, prompting a re-inspection of all buildings on the property by the local municipality....
FSU Doak Campbell Stadium
January 2016 -- Florida State University planned to enclose the south end of Doak Campbell Stadium to create the Champions Club Level which will offer over 5,000 premium seats,...
Environmental Treatment Plant - West Elizabeth, PA
 A proposed environmental treatment plant would include two main structures with building footprints of 1,980 and 3,200 square feet. The buildings would be located downslope...
Total Case Studies: 190

FSI Technical Manual
Evaluation Reports
For more information about continuing education courses, contact Training@supportworks.com Sign Up to Become A Foundation Repair Dealer