Case Studies From Foundation Supportworks

Case Studies

Pinckney Hill Plantation Home - Monticello, FL
March 2011-A new 22,000 square foot slab-on-grade, single-family residence was planned within the Pinckney Hill Plantation development. The original geotechnical report for...
Northern Natural Gas Substation - Argyle, WI
March 2011- Northern Natural Gas (NNG), headquartered in Omaha, NE, contacted Foundation Supportworks of WI (FSW) to stabilize a settled heater building at their substation...
Lone Star Mercedes Benz - Calgary, Alberta, Canada
August 2010- The Lone Star Mercedes Benz car dealership planned a renovation to their existing facility that included the construction of an approximate 1,000 square foot...
Renovation Project - Gulf Shore Blvd - Naples, FL
January 2011- An existing single family residence underwent a renovation project to the main and second floors of the structure. The home, located on the Gulf of Mexico, was...
Lion and Baboon Exhibit - Knoxville, TN
September 2010- The proposed site for the new Knoxville Zoo Lion and Baboon Exhibit was within a previously developed area of the property. The six test borings completed...
Holiday Inn Hotel and Water Park - Omaha, NE
October 2008- The new Holiday Inn Hotel and Water Park was constructed just north of downtown Omaha, north of the Qwest Center and north of the new baseball stadium built...
Hi-Tower Farms - Valders, WI
March 2010- In 2010, Keller, Inc. began construction of a free stall milking complex designed to handle up to 380 head of cattle at a dairy farm operation. The exterior foundation...
Central Decatur School Renovation Project - Leon, IA
June 2009- The Central Decatur Community High School underwent a renovation project to repair distress in the building caused by settlement. Differential cracking in the floor...
Culver's Restaurant - Orland Park, IL
November 2009- Construction details for the new Culver’s restaurant included an 8-inch-thick poured concrete foundation wall, steel framing and anchored masonry veneer....
Brookhaven Recycling Facility - Yaphank, NY
November 2010- The Brookhaven Recycling Facility in Yaphank, New York planned an expansion project to increase the size of the existing facility by 12,000 square feet. The...
Blount Street Substation - Madison, WI
September 2010- The Blount Street Substation project included the installation of a new underground transmission line. Upon completion of the new underground line, an existing...
Florida Association of Court Clerks - Tallahassee, FL
January 2010 The Florida Association of Court Clerks building underwent a renovation project that included repair of drywall cracks and other distress-related issues caused...
A & G Machine - Equipment Foundations - Auburn, WA
January 2011 A & G Machine, an aircraft component manufacturer in Washington, planned to install two new pieces of heavy equipment in an existing 24,000 square foot building....
I-80 Box Culvert Extension - Greenwood, NE
June 2009 The Interstate 80 (I-80) corridor between Omaha, NE and Lincoln, NE is currently undergoing several phases of reconstruction that includes road widening, new bridge...
First Business Center - Appleton, WI
June 2009 The First Business Center building located on the corner of Hwy 41 and Hwy BB was being sold. The title work showed a portion of the property encroached on Hwy 41’s...
Total Case Studies: 192