Case Studies From Foundation Supportworks

Case Studies

SPSA Steam Plant - Portsmouth, VA
January 2009 -The Southeastern Public Service Authority (SPSA) Steam Plant is located along the Elizabeth River and adjacent to the Norfolk Naval Shipyard. The plant burns...
Lion and Baboon Exhibit - Knoxville, TN
September 2010- The proposed site for the new Knoxville Zoo Lion and Baboon Exhibit was within a previously developed area of the property. The six test borings completed...
Hi-Tower Farms - Valders, WI
March 2010- In 2010, Keller, Inc. began construction of a free stall milking complex designed to handle up to 380 head of cattle at a dairy farm operation. The exterior foundation...
Culver's Restaurant - Orland Park, IL
November 2009- Construction details for the new Culver’s restaurant included an 8-inch-thick poured concrete foundation wall, steel framing and anchored masonry veneer....
Des Peres Hospital Retaining Wall - St. Louis, MO
Des Peres Hospital is a 143-bed medical facility in St. Louis County, Missouri. A 13-foot tall, 12-inch thick poured concrete retaining wall provides approximately nine feet...
Boat Dock at Private Lake - Aspen, CO
A new boat dock was planned along the shoreline of a small manmade lake that formed within the limits of an abandoned gravel pit. The proposed dock would extend out into the...
GRAY'S LAKE BOARDWALK
A beach (at grade) boardwalk was proposed at Gray’s Lake Park within the area between the Raccoon River and Gray’s Lake. The ADA compliant boardwalk would extend...
CSL Plasma Building Renovation
CSL Plasma planned renovations to a vacant end unit of a strip mall. The rear left corner of the unit had settled as much as two inches, evident by a large diagonal crack...
Historic Fleming Building Renovation
The 11-story Fleming Building in downtown Des Moines was built in 1909. The lowrise building was constructed as a steel rigid frame with a brick and granite façade. Renovation...
Tuxworth Springs Condos - Wall Stabilization
The condominium complex had a large trash compactor enclosed by three concrete block retaining walls and an access gate. The enclosure footprint measured approximately...
Hamilton Elementary School
A slab-on-grade building addition was planned along the south and east sides of an existing school gymnasium. The gymnasium had experienced differential settlement at...
Cottage Foundations
A 4,000 square-foot family cottage was planned for a lakefront property. A geotechnical investigation identified a general soil profile consisting of approximately 45...
Total Case Studies: 184