A 2,800-square-foot addition was planned to extend the warehouse at four loading dock doors. The geotechnical investigation performed for the proposed...
1-844-225-3917
A 2,800-square-foot addition was planned to extend the warehouse at four loading dock doors. The geotechnical investigation performed for the proposed...
April 2015 -- A new blower building was planned at a wastewater treatment facility. The area chosen for the proposed structure...
A new maintenance building was planned at an existing water treatment plant. The maintenance building would be a steel-framed structure with...
The local ABC affiliate, KETV, acquired the historic Burlington Train Station to be remodeled as a broadcast and web-media facility. This...
The Cass Lake Clinic expansion consisted of an approximate 25,400 square foot addition to the existing hospital/clinic building. The project required...
March 2011 -St. Norbert College planned a $1,175,000 addition and renovation to their existing admission center. The new addition consisted...
September 2010 -The RTD Elati Light Rail Maintenance Facility project included the construction of a new rail car wash bay....
June 2009- The Central Decatur Community High School underwent a renovation project to repair distress in the building caused by...
A new single-story, slab-on-grade building was planned adjacent to the existing bank.When completed, banking operations would move to the new...
March 2009 -- The Abraham Lincoln High School was built in 1960 with construction consisting of poured concrete foundations, steel...
November 2009 -The Davis Residence, built in 1999, is a two-story home with an unfinished walkout basement. When the Davis...
December 2010 - The Boulder Rural Fire Department planned to renovate an older office building to serve as a fire...