A 4,000 square-foot family cottage was planned for a lakefront property. A geotechnical investigation identified a general soil profile consisting of...
1-866-375-9990
A 4,000 square-foot family cottage was planned for a lakefront property. A geotechnical investigation identified a general soil profile consisting of...
A slab-on-grade building addition was planned along the south and east sides of an existing school gymnasium. The gymnasium had experienced...
An equipment addition was planned within a three-story, steel foundry building. The equipment would be supported on four columns with an...
February 2010 - The Camelot Apartment Complex was constructed in 1977 and consists of 13 multi-unit buildings, each building with...
June 2009 - The Coyle home is a ranch-style home built in the 1960’s. The three bedroom ranch and one...
January 2010- The renovation project for the Heatherwood Elementary School in Boulder, Colorado included repair work in an existing area...
Two overhead cranes and 12 heavy equipment additions were planned within two 120 feet by 205 feet, slab-on-grade buildings at a...
The condominium complex had a large trash compactor enclosed by three concrete block retaining walls and an access gate. The enclosure...
March 2009- The Gundersen Lutheran Medical Center owned land near a tributary of the Mississippi River where they planned to...
September 2009 - The existing YMCA building was constructed in the 1970’s and generally consists of 12-foot high by 12-inch...
May 2009 - The Affinity Health Group Clinic is within a building having both a crawl space and full basement....
A 20-foot by 45-foot, slab-on-grade, single-story equipment building had settled differentially at one end. Building construction consisted of shallow continuous wall footings,...