A 20-foot by 45-foot, slab-on-grade, single-story equipment building had settled differentially at one end. Building construction consisted of shallow continuous wall footings,...
1-844-225-3917
A 20-foot by 45-foot, slab-on-grade, single-story equipment building had settled differentially at one end. Building construction consisted of shallow continuous wall footings,...
Two overhead cranes and 12 heavy equipment additions were planned within two 120 feet by 205 feet, slab-on-grade buildings at a...
In 2009, the YMCA began construction of a 13 million dollar addition. The new addition was to include a new...
The Whitefish Bay High School was originally constructed in 1930. Since then it has received additions in 1941, 1967 and...
An addition was planned east of the St. Michael Lutheran Church sanctuary. The addition had plan dimensions of 40 feet...
The Camelot Apartment Complex was constructed in 1977 and consists of 13 multi-unit buildings, each building with approximate plan dimensions...
The Coyle home is a ranch-style home built in the 1960’s. The three bedroom ranch and one car garage were...
The Affinity Health Group Clinic is within a building having both a crawl space and full basement. Construction details include...
The renovation project for the Heatherwood Elementary School in Boulder, Colorado included repair work in an existing area of the...
The existing YMCA building was constructed in the 1970’s and generally consists of 12-foot high by 12-inch thick poured concrete...
A $3 million dryer addition was proposed with new foundations within and adjacent to an existing one-story building with basement....
The Gundersen Lutheran Medical Center owned land near a tributary of the Mississippi River where they planned to construct a...