The project site is a former coal fired power station being renovated to receive crude oil delivered by rail from North...
1-844-225-3917
The project site is a former coal fired power station being renovated to receive crude oil delivered by rail from North...
A 20 foot by 40 foot in-ground swimming pool with surrounding concrete deck was planned. The pool would have a sloped...
A new 379,800 sq. ft. warehouse was proposed on a site that had been previously used to dispose of mine waste...
A designer beach house conceptualized in 1934 by French architect, Charlotte Perriand, was planned for construction and temporary display outside the...
Saint Alexius Hospital planned several building improvements including the placement of large mechanical equipment on the roof of a four-story wing....
Palmer College of Chiropractic planned an elevator addition to the outside of an existing building near the location where two "wings"...
A slab-on-grade, steel-framed addition was proposed for the Moss Performing Arts Center at Colorado Mesa University. Previous subsurface explorations completed...
Voids were suspected beneath areas of Casio America, Inc.'s concrete slab-on-grade warehouse floor. The voids caused rocking in slab sections and...
An elevator addition was planned within the original Wilson Middle School building constructed in 1933. A soil boring completed outside the...
An approximate 510 square meter (55,000 square foot) building addition was proposed to create a ground floor for the southern...
The Eastbay headquarters building in Wausau, Wisconsin had been experiencing differential settlement for many years. An area of particular concern was...
Within the first six months of construction, the northwest corner of a 1,600 square-foot winery settled approximately 3.5 inches. The area...