The Exile Brewing Company was renovating an early twentieth-century brick building in downtown Des Moines. Renovations included a restaurant and...
1-844-225-3917
The Exile Brewing Company was renovating an early twentieth-century brick building in downtown Des Moines. Renovations included a restaurant and...
The Eastbay headquarters building in Wausau, Wisconsin had been experiencing differential settlement for many years. An area of particular concern was...
A new 379,800 sq. ft. warehouse was proposed on a site that had been previously used to dispose of mine waste...
Voids were suspected beneath areas of Casio America, Inc.'s concrete slab-on-grade warehouse floor. The voids caused rocking in slab sections and...
A slab-on-grade, steel-framed addition was proposed for the Moss Performing Arts Center at Colorado Mesa University. Previous subsurface explorations completed...
An approximate 510 square meter (55,000 square foot) building addition was proposed to create a ground floor for the southern...
Palmer College of Chiropractic planned an elevator addition to the outside of an existing building near the location where two "wings"...
The two-story, wood-frame home was built in 1999. Light loads from the first floor construction were reportedly supported by the slab-on-grade...
The project site is a former coal fired power station being renovated to receive crude oil delivered by rail from North...
A 20 foot by 40 foot in-ground swimming pool with surrounding concrete deck was planned. The pool would have a sloped...
A designer beach house conceptualized in 1934 by French architect, Charlotte Perriand, was planned for construction and temporary display outside the...
An elevator addition was planned within the original Wilson Middle School building constructed in 1933. A soil boring completed outside the...