An environmental study discovered contaminated soils to depths of 20 feet and extending beneath one end of an existing warehouse....
1-844-225-3917
An environmental study discovered contaminated soils to depths of 20 feet and extending beneath one end of an existing warehouse....
The original school building and gymnasium on the Browne Education Campus were constructed around 1920. The north and west walls...
A 2,600 square-foot duplex home was planned for construction on two residential lots sandwiched between properties with existing homes. The...
The Montgomery tower is a 240-foot high communication tower supported with guy wires attached to three 16-foot high reaction guy...
Renovations at the wastewater treatment facility included the construction of a new generator pad east of an existing blower building....
Renovations were planned for a circa 1920s, two-story building in downtown Portland. The project involved adding a third story to...
The Naval Air Station Pensacola planned to install a new jib crane for an existing indoor pool facility. The foundation...
A 15-foot by 95-foot area of the existing single-story, slab-on-grade building was experiencing differential settlement of the interior floor slab...
A local hospital planned to add a new computed tomography (CT) scanner to the radiology department. A 9-foot by 48-foot...
A new Citizens First Credit Union was to be constructed across two previously developed properties with existing structures. The existing...
The Kingsmill Resort planned to remove the existing one-story marina and restaurant building and replace it with a new two-story...
The original school building for Our Lady of Lourdes Central Catholic School was constructed in 1951. Plans for a new...