Palmer College of Chiropractic planned an elevator addition to the outside of an existing building near the location where two "wings"...
1-844-225-3917
Palmer College of Chiropractic planned an elevator addition to the outside of an existing building near the location where two "wings"...
The two-story, wood-frame home was built in 1999. Light loads from the first floor construction were reportedly supported by the slab-on-grade...
A renovation at the Smithsonian’s William H. Gross Stamp Gallery included the construction of a new interior elevator shaft. A...
A new single-story, wood-frame dental office with crawl space was planned at the top of a steep slope on a...
A 20 foot by 40 foot in-ground swimming pool with surrounding concrete deck was planned. The pool would have a sloped...
November 2012 - Building 4602 within the Skaff Apartments complex was constructed in 1987 of wood framing and brick veneer...
The Exile Brewing Company was renovating an early twentieth-century brick building in downtown Des Moines. Renovations included a restaurant and...
The Parks Board of Clarksburg, West Virginia commissioned the repair of concrete landings at “The Amp”, the community’s 2,000 seat...
A new 379,800 sq. ft. warehouse was proposed on a site that had been previously used to dispose of mine waste...
A slab-on-grade, steel-framed addition was proposed for the Moss Performing Arts Center at Colorado Mesa University. Previous subsurface explorations completed...
A designer beach house conceptualized in 1934 by French architect, Charlotte Perriand, was planned for construction and temporary display outside the...
The project site is a former coal fired power station being renovated to receive crude oil delivered by rail from North...