The Exile Brewing Company was renovating an early twentieth-century brick building in downtown Des Moines. Renovations included a restaurant and...
1-844-225-3917
The Exile Brewing Company was renovating an early twentieth-century brick building in downtown Des Moines. Renovations included a restaurant and...
Six apartment buildings within the Royal Estates Apartment Complex were experiencing differential settlement, with measured movements as much as four...
The two-story, wood-frame home was built in 1999. Light loads from the first floor construction were reportedly supported by the slab-on-grade...
A new 379,800 sq. ft. warehouse was proposed on a site that had been previously used to dispose of mine waste...
Saint Alexius Hospital planned several building improvements including the placement of large mechanical equipment on the roof of a four-story...
Palmer College of Chiropractic planned an elevator addition to the outside of an existing building near the location where two "wings"...
A designer beach house conceptualized in 1934 by French architect, Charlotte Perriand, was planned for construction and temporary display outside the...
A slab-on-grade, steel-framed addition was proposed for the Moss Performing Arts Center at Colorado Mesa University. Previous subsurface explorations completed...
The original tieback system for two intersecting, perpendicular 15-foot high (above mudline) bulkhead seawalls constructed in the 1950s had begun to...
The project site is a former coal fired power station being renovated to receive crude oil delivered by rail from North...
A 20 foot by 40 foot in-ground swimming pool with surrounding concrete deck was planned. The pool would have a sloped...
A long strip footing was constructed on an adjacent lot approximately six feet away from the west exterior wall of...