Additions planned for an existing manufacturing facility included a large furnace and a 30-ton crane. Each addition would require its...
1-844-225-3917
Additions planned for an existing manufacturing facility included a large furnace and a 30-ton crane. Each addition would require its...
The “Villages of Twin Oaks” development project was planned southeast of the Big Bend Road and Missouri State Route 141...
A building addition east of the St. Charles High School was designed to have concrete drilled shaft foundations near the...
The building footprint included a wedge-shaped auditorium with a lower stage and stair-stepped seating. The stage and the lower seating...
A curved concrete retaining wall was needed for a retention basin area at the new 51,000 square foot public safety...
The sidewalk surrounding the public restroom building at Northwest Park in Davenport, Iowa experienced differential settlement, evident by faulted slab...
The STEAM (Science, Technology, Engineering, Art and Math) Elementary School building, originally built in 1967, was planned to receive upgrades...
Papa John’s Cardinal Stadium is an open-air football stadium which is home to the University of Louisville Cardinals. A $63...
A ranch style, slab-on-grade duplex had a stable exterior foundation but poor slab support conditions on the interior. The worst...
An area of land near a major interstate was under development with multiple buildings being constructed. The construction would also...
Renovation plans for the existing facility included the removal and relocation of an existing interior column. The new column location...
The slab of a 60-foot diameter grain silo had experienced about 12 inches of differential settlement. The settlement caused the...