A curved concrete retaining wall was needed for a retention basin area at the new 51,000 square foot public safety...
1-866-375-9990
A curved concrete retaining wall was needed for a retention basin area at the new 51,000 square foot public safety...
The “Villages of Twin Oaks” development project was planned southeast of the Big Bend Road and Missouri State Route 141...
The Florida State University Physics Department planned to install a spectograph in the basement of Collins Hall, which was constructed...
A $400 million building expansion at the Tallahassee Memorial Healthcare facility included the installation of a new cooling tower on...
A building addition east of the St. Charles High School was designed to have concrete drilled shaft foundations near the...
Florida State University planned to enclose the south end of Doak Campbell Stadium to create the Champions Club Level which...
The STEAM (Science, Technology, Engineering, Art and Math) Elementary School building, originally built in 1967, was planned to receive upgrades...
The sidewalk surrounding the public restroom building at Northwest Park in Davenport, Iowa experienced differential settlement, evident by faulted slab...
Renovation plans for the existing facility included the removal and relocation of an existing interior column. The new column location...
The slab of a 60-foot diameter grain silo had experienced about 12 inches of differential settlement. The settlement caused the...
Papa John’s Cardinal Stadium is an open-air football stadium which is home to the University of Louisville Cardinals. A $63...
A ranch style, slab-on-grade duplex had a stable exterior foundation but poor slab support conditions on the interior. The worst...