A $400 million building expansion at the Tallahassee Memorial Healthcare facility included the installation of a new cooling tower on...
1-866-375-9990
A $400 million building expansion at the Tallahassee Memorial Healthcare facility included the installation of a new cooling tower on...
A ranch style, slab-on-grade duplex had a stable exterior foundation but poor slab support conditions on the interior. The worst...
The Florida State University Physics Department planned to install a spectograph in the basement of Collins Hall, which was constructed...
Papa John’s Cardinal Stadium is an open-air football stadium which is home to the University of Louisville Cardinals. A $63...
Renovation plans for the existing facility included the removal and relocation of an existing interior column. The new column location...
The sidewalk surrounding the public restroom building at Northwest Park in Davenport, Iowa experienced differential settlement, evident by faulted slab...
Florida State University planned to enclose the south end of Doak Campbell Stadium to create the Champions Club Level which...
The “Villages of Twin Oaks” development project was planned southeast of the Big Bend Road and Missouri State Route 141...
A curved concrete retaining wall was needed for a retention basin area at the new 51,000 square foot public safety...
The STEAM (Science, Technology, Engineering, Art and Math) Elementary School building, originally built in 1967, was planned to receive upgrades...
The slab of a 60-foot diameter grain silo had experienced about 12 inches of differential settlement. The settlement caused the...
A building addition east of the St. Charles High School was designed to have concrete drilled shaft foundations near the...