Excessive vertical movement of the 3,240 square-foot home caused doors and windows to stick and drywall to crack. A geotechnical...
1-844-225-3917
Excessive vertical movement of the 3,240 square-foot home caused doors and windows to stick and drywall to crack. A geotechnical...
The parking garage was supported on drilled shaft foundations. The stonework façade was supported independently from the parking structure on...
A local Taco Bell had been going through extensive remodeling in preparation for its grand reopening. Less than two weeks...
The Nebraska Department of Roads (NDOR) commissioned the repair of a 24-foot wide, 100-foot long section of Highway 6 near...
The Illinois Department of Transportation (IDOT) was receiving complaints from motorists that large bumps existed on a recently resurfaced section...
Menard Hall on the Lincoln Land Community College campus is a two-story structure with offices, classrooms, and student dining. Renovations...
A series of bridge rehabilitations were scheduled on the Interstate interchange connecting East and West bound I-70 traffic to North...
The Hickey Elementary School building was constructed in 1965. An elevator addition was planned for the school to comply with...
Commuter complaints to the Illinois Department of Transportation (IDOT) reported uneven lanes and large “bumps” along westbound Interstate 64 as...
A 5,200 square-foot, two-story addition was proposed for the existing 6,800 square-foot school building. The continuous footing and three column...
A local automotive parts distributor planned to have a new 113,000-square foot distribution warehouse built. The proposed metal building would...
A second level was planned for an existing one-story building. It was determined the second story addition would overload four...