Chiller equipment was installed circa 2000 for a new middle school addition. The equipment was originally installed within a stand-alone,...
1-866-375-9990
Chiller equipment was installed circa 2000 for a new middle school addition. The equipment was originally installed within a stand-alone,...
The Abraham Lincoln High School was built in 1960 with construction consisting of poured concrete foundations, steel framing and masonry...
Shortly after construction began on a home on Big Floyd Lake, the builder began to observe early warning signs of...
A new single-story, slab-on-grade building was planned adjacent to the existing bank. When completed, banking operations would move to the...
The Davis Residence, built in 1999, is a two-story home with an unfinished walkout basement. When the Davis family considered...
St. Norbert College planned a $1,175,000 addition and renovation to their existing admission center. The new addition consisted of a...
The Crossing is a facility owned by The Wesley Foundation. In 2010, the building was to undergo a 1.6 million...
The RTD Elati Light Rail Maintenance Facility project included the construction of a new rail car wash bay. The 120-foot...
The Boulder Rural Fire Department planned to renovate an older office building to serve as a fire station. The project...
An addition was planned for the existing Verizon Data Center building. The addition would be located within the paved area...
A historic home built in the early 1900’s was experiencing both lateral and vertical movement as an adjacent 17-foot tall...
The Central Decatur Community High School underwent a renovation project to repair distress in the building caused by settlement. Differential...