The Hickey Elementary School building was constructed in 1965. An elevator addition was planned for the school to comply with...
1-866-375-9990
The Hickey Elementary School building was constructed in 1965. An elevator addition was planned for the school to comply with...
A local automotive parts distributor planned to have a new 113,000-square foot distribution warehouse built. The proposed metal building would...
Additions planned for an existing manufacturing facility included a large furnace and a 30-ton crane. Each addition would require its...
An area of land near a major interstate was under development with multiple buildings being constructed. The construction would also...
The STEAM (Science, Technology, Engineering, Art and Math) Elementary School building, originally built in 1967, was planned to receive upgrades...
The building footprint included a wedge-shaped auditorium with a lower stage and stair-stepped seating. The stage and the lower seating...
A 5,200 square-foot, two-story addition was proposed for the existing 6,800 square-foot school building. The continuous footing and three column...
A curved concrete retaining wall was needed for a retention basin area at the new 51,000 square foot public safety...
Renovation plans for the existing facility included the removal and relocation of an existing interior column. The new column location...
The “Villages of Twin Oaks” development project was planned southeast of the Big Bend Road and Missouri State Route 141...
Papa John’s Cardinal Stadium is an open-air football stadium which is home to the University of Louisville Cardinals. A $63...
A building addition east of the St. Charles High School was designed to have concrete drilled shaft foundations near the...