Private Boat Harbor - Naples, FL
A 216-foot-long by 60-foot-wide, L-shaped inlet waterway was planned at the site of a bayside residence. The proposed dredging would allow water from the adjacent bay to flow...
I-80 Bridge Departure Slab
The Nebraska Department of Roads (NDOR) was experiencing as much as two inches of settlement over a 100’ x 25’ section of bridge departure on eastbound Interstate...
TDOT I-24 Settlement Remediation
The Tennessee Department of Transportation (TDOT) observed 1,700 feet of the eastbound center lane of Interstate 24 had settled as much as two inches. More concerning about...
I-80 Bridges - 56th to Waverly Interchange
Three newly constructed bridges on Interstate 80 showed significant settlement on the approach slabs within a relatively short time after construction. The pavement was in...
Brace Hall Floor Void Filling
Brace Hall is a 110 year old, three story structure sitting in the shadow of Memorial Stadium on the University of Nebraska campus. During recent renovations, the...
Buffalo & Pittsburgh Railroad
The Buffalo & Pittsburgh Railroad (BPRR) is a 368 mile long, class II railroad operating from Butler, PA to Buffalo, NY carrying commodities such as paper, petroleum,...
Elevated Conveyor Support
I.E.I. Barge Services planned for a new overhead conveyor system to extend from a proposed rail/truck receiving pit to two material handling buildings at the facility. The...
Delaware SR1 Pavement Leveling
The Delaware Department of Transportation (DelDOT) observed that three section-lengths of the southbound lanes of the Korean War Veterans Memorial Highway (SR1) had settled...
Westbrooke Village Apartments - St. Louis, MO
 New owners of a 250-unit apartment complex planned for a multi-million-dollar renovation, prompting a re-inspection of all buildings on the property by the local municipality....
FSU Doak Campbell Stadium
January 2016 -- Florida State University planned to enclose the south end of Doak Campbell Stadium to create the Champions Club Level which will offer over 5,000 premium seats,...
Environmental Treatment Plant - West Elizabeth, PA
 A proposed environmental treatment plant would include two main structures with building footprints of 1,980 and 3,200 square feet. The buildings would be located downslope...
University of Iowa - Flood Recovery
After the 2008 flood events in eastern Iowa, the Federal Emergency Management Agency (FEMA) reevaluated the 100 and 500 year floodplains for the affected area. As a result,...