The Blount Street Substation project included the installation of a new underground transmission line. Upon completion of the new underground...
1-844-225-3917
The Blount Street Substation project included the installation of a new underground transmission line. Upon completion of the new underground...
The Florida Association of Court Clerks building underwent a renovation project that included repair of drywall cracks and other distress-related...
The Brookhaven Recycling Facility in Yaphank, New York planned an expansion project to increase the size of the existing facility...
Northern Natural Gas (NNG), headquartered in Omaha, NE, needed to stabilize a settled heater building at their substation near Argyle,...
A & G Machine, an aircraft component manufacturer in Washington, planned to install two new pieces of heavy equipment in...
The new Holiday Inn Hotel and Water Park was constructed just north of downtown Omaha, north of the Qwest Center...
The Lone Star Mercedes Benz car dealership planned a renovation to their existing facility that included the construction of an...
A new 22,000 square foot slab-on-grade, single-family residence was planned within the Pinckney Hill Plantation development. The original geotechnical report...
The First Business Center building located on the corner of Hwy 41 and Hwy BB was being sold. The title...
The Springfield Housing Authority planned the construction of a new maintenance building. The one-story, slab-on-grade building had plan dimensions of...
An existing single family residence underwent a renovation project to the main and second floors of the structure. The home,...
The Interstate 80 (I-80) corridor between Omaha, NE and Lincoln, NE is currently undergoing several phases of reconstruction that includes...