Two overhead cranes and 12 heavy equipment additions were planned within two 120 feet by 205 feet, slab-on-grade buildings at a...
1-866-375-9990
Two overhead cranes and 12 heavy equipment additions were planned within two 120 feet by 205 feet, slab-on-grade buildings at a...
A 20-foot by 45-foot, slab-on-grade, single-story equipment building had settled differentially at one end. Building construction consisted of shallow continuous wall footings,...
May 2009 - The Affinity Health Group Clinic is within a building having both a crawl space and full basement....
February 2010 - The Camelot Apartment Complex was constructed in 1977 and consists of 13 multi-unit buildings, each building with...
June 2009 - The Coyle home is a ranch-style home built in the 1960’s. The three bedroom ranch and one...
September 2009 - The existing YMCA building was constructed in the 1970’s and generally consists of 12-foot high by 12-inch...
January 2010- The renovation project for the Heatherwood Elementary School in Boulder, Colorado included repair work in an existing area...
March 2009- The Gundersen Lutheran Medical Center owned land near a tributary of the Mississippi River where they planned to...
August 2010- A $3 million dryer addition was proposed with new foundations within and adjacent to an existing one-story building...
February 2010- In 2009, the YMCA began construction of a 13 million dollar addition. The new addition was to include...
December 2010 - An addition was planned east of the St. Michael Lutheran Church sanctuary. The addition had plan dimensions...
September 2010 -The Whitefish Bay High School was originally constructed in 1930. Since then it has received additions in 1941,...