The two-story, wood-frame home was built in 1999. Light loads from the first floor construction were reportedly supported by the slab-on-grade...
1-844-225-3917
The two-story, wood-frame home was built in 1999. Light loads from the first floor construction were reportedly supported by the slab-on-grade...
A new 379,800 sq. ft. warehouse was proposed on a site that had been previously used to dispose of mine waste...
A new single-story, wood-frame dental office with crawl space was planned at the top of a steep slope on a...
Palmer College of Chiropractic planned an elevator addition to the outside of an existing building near the location where two "wings"...
A slab-on-grade, steel-framed addition was proposed for the Moss Performing Arts Center at Colorado Mesa University. Previous subsurface explorations completed...
A renovation at the Smithsonian’s William H. Gross Stamp Gallery included the construction of a new interior elevator shaft. A...
November 2012 - Building 4602 within the Skaff Apartments complex was constructed in 1987 of wood framing and brick veneer...
The Parks Board of Clarksburg, West Virginia commissioned the repair of concrete landings at “The Amp”, the community’s 2,000 seat...
The project site is a former coal fired power station being renovated to receive crude oil delivered by rail from North...
A 20 foot by 40 foot in-ground swimming pool with surrounding concrete deck was planned. The pool would have a sloped...
A designer beach house conceptualized in 1934 by French architect, Charlotte Perriand, was planned for construction and temporary display outside the...
The Exile Brewing Company was renovating an early twentieth-century brick building in downtown Des Moines. Renovations included a restaurant and...