Within the first six months of construction, the northwest corner of a 1,600 square-foot winery settled approximately 3.5 inches. The area...
1-844-225-3917
Within the first six months of construction, the northwest corner of a 1,600 square-foot winery settled approximately 3.5 inches. The area...
The Eastbay headquarters building in Wausau, Wisconsin experienced differential settlement of the interior floor slab with measured slab movement as much...
An elevator addition was planned within the original Wilson Middle School building constructed in 1933. A soil boring completed outside the...
Voids were suspected beneath areas of Casio America, Inc.'s concrete slab-on-grade warehouse floor. The voids caused rocking in slab sections and...
An approximate 510 square meter (55,000 square foot) building addition was proposed to create a ground floor for the southern...
The Eastbay headquarters building in Wausau, Wisconsin had been experiencing differential settlement for many years. An area of particular concern was...