Within the first six months of construction, the northwest corner of a 1,600 square-foot winery settled approximately 3.5 inches. The area...
1-866-375-9990
Within the first six months of construction, the northwest corner of a 1,600 square-foot winery settled approximately 3.5 inches. The area...
The Eastbay headquarters building in Wausau, Wisconsin had been experiencing differential settlement for many years. An area of particular concern was...
A long strip footing was constructed on an adjacent lot approximately six feet away from the west exterior wall of...
Palmer College of Chiropractic planned an elevator addition to the outside of an existing building near the location where two "wings"...
Saint Alexius Hospital planned several building improvements including the placement of large mechanical equipment on the roof of a four-story...
A designer beach house conceptualized in 1934 by French architect, Charlotte Perriand, was planned for construction and temporary display outside the...
An elevator addition was planned within the original Wilson Middle School building constructed in 1933. A soil boring completed outside the...
Voids were suspected beneath areas of Casio America, Inc.'s concrete slab-on-grade warehouse floor. The voids caused rocking in slab sections and...
The Eastbay headquarters building in Wausau, Wisconsin experienced differential settlement of the interior floor slab with measured slab movement as much...
An approximate 510 square meter (55,000 square foot) building addition was proposed to create a ground floor for the southern...
A slab-on-grade, steel-framed addition was proposed for the Moss Performing Arts Center at Colorado Mesa University. Previous subsurface explorations completed...