The second level of the Carlton Building parking garage was constructed half on grade and half above another parking lot....
1-844-225-3917
The second level of the Carlton Building parking garage was constructed half on grade and half above another parking lot....
The Tennessee Department of Transportation (TDOT) observed 1,700 feet of the eastbound center lane of Interstate 24 had settled as...
Brace Hall is a 110 year old, three story structure sitting in the shadow of Memorial Stadium on the University...
May 2015 -- During a large flood event in downtown Cedar Rapids, an underground diesel storage tank was compromised and...
An elevated beach house built in 1949 was supported on timber pilings with wood cross bracing. Partial deterioration of the...
The Nebraska Department of Roads (NDOR) was experiencing as much as two inches of settlement over a 100’ x 25’...
The Buffalo & Pittsburgh Railroad (BPRR) is a 368 mile long, class II railroad operating from Butler, PA to Buffalo,...
A swimming pool was planned behind a bayside home that was still under construction. The cinderblock and wood framework of...
Renovations to the Pasco County School District Offices included an interior elevator addition within one of the existing buildings. The...
A 216-foot-long by 60-foot-wide, L-shaped inlet waterway was planned at the site of a bayside residence. The proposed dredging would...
The Science Museum of Virginia planned to open a new permanent exhibit called “Speed”. The centerpiece of this exhibit would...
Three newly constructed bridges on Interstate 80 showed significant settlement on the approach slabs within a relatively short time after...