After the 2008 flood events in eastern Iowa, the Federal Emergency Management Agency (FEMA) reevaluated the 100 and 500 year...
1-844-225-3917
After the 2008 flood events in eastern Iowa, the Federal Emergency Management Agency (FEMA) reevaluated the 100 and 500 year...
The 70-foot-long by 40-foot-deep “bump-out” section of the library experienced differential settlement relative to the main structure and along its...
Wainwright Hall at the Fort Riley Military Reservation in north central Kansas was constructed in 1889. A 50-foot-long by 10-foot-wide...
I.E.I. Barge Services planned for a new overhead conveyor system to extend from a proposed rail/truck receiving pit to two...
Two new, independent sections of stormwater outfall sewers were proposed through a flood mitigation levee along the east bank of...
Oak Hall is a five-story building on the University of Missouri-Kansas City (UMKC) campus. Up to three inches of differential...
A sanitary sewer forcemain was planned along an existing roadway. A 280 meter long section of the forcemain would include...
A proposed environmental treatment plant would include two main structures with building footprints of 1,980 and 3,200 square feet. The...
The Delaware Department of Transportation (DelDOT) observed that three section-lengths of the southbound lanes of the Korean War Veterans Memorial...
New owners of a 250-unit apartment complex planned for a multi-million-dollar renovation, prompting a re-inspection of all buildings on the...
A high-traffic bridge approach which was experiencing settlement in Jacksonville, Florida. An eight (8) to 12 inch void had developed...
The renovation of a 15,000-square-foot building was planned at the Bowe Machine facility. New foundations were required at 39 new...