July 2010 - The Crossing is a facility owned by The Wesley Foundation. In 2010, the building was to undergo...
1-844-225-3917
July 2010 - The Crossing is a facility owned by The Wesley Foundation. In 2010, the building was to undergo...
September 2010 -The RTD Elati Light Rail Maintenance Facility project included the construction of a new rail car wash bay....
June 2009- The Central Decatur Community High School underwent a renovation project to repair distress in the building caused by...
A historic home built in the early 1900’s was experiencing both lateral and vertical movement as an adjacent 17-foot tall...
October 2012 - Chiller equipment was installed circa 2000 for a new middle school addition. The equipment was originally installed...
A new single-story, slab-on-grade building was planned adjacent to the existing bank.When completed, banking operations would move to the new...
March 2009 -- The Abraham Lincoln High School was built in 1960 with construction consisting of poured concrete foundations, steel...
November 2009 -The Davis Residence, built in 1999, is a two-story home with an unfinished walkout basement. When the Davis...
December 2010 - An addition was planned for the existing Verizon Data Center building. The addition would be located within...
December 2010 - The Boulder Rural Fire Department planned to renovate an older office building to serve as a fire...
December 2009 Shortly after construction began on a home on Big Floyd Lake, the builder began to observe early warning...
January 2009 -The Southeastern Public Service Authority (SPSA) Steam Plant is located along the Elizabeth River and adjacent to the...