A historic home built in the early 1900’s was experiencing both lateral and vertical movement as an adjacent 17-foot tall...
1-844-225-3917
A historic home built in the early 1900’s was experiencing both lateral and vertical movement as an adjacent 17-foot tall...
An addition with a basement level was planned for the hospital. The existing exterior foundation walls adjacent to the addition would...
The local ABC affiliate, KETV, acquired the historic Burlington Train Station to be remodeled as a broadcast and web-media facility. This...
September 2010 -The RTD Elati Light Rail Maintenance Facility project included the construction of a new rail car wash bay....
March 2009 -- The Abraham Lincoln High School was built in 1960 with construction consisting of poured concrete foundations, steel...
November 2009 -The Davis Residence, built in 1999, is a two-story home with an unfinished walkout basement. When the Davis...
March 2011 -St. Norbert College planned a $1,175,000 addition and renovation to their existing admission center. The new addition consisted...
July 2010 - The Crossing is a facility owned by The Wesley Foundation. In 2010, the building was to undergo...
A new single-story, slab-on-grade building was planned adjacent to the existing bank.When completed, banking operations would move to the new...
The Cass Lake Clinic expansion consisted of an approximate 25,400 square foot addition to the existing hospital/clinic building. The project required...
June 2009- The Central Decatur Community High School underwent a renovation project to repair distress in the building caused by...
October 2012 - Chiller equipment was installed circa 2000 for a new middle school addition. The equipment was originally installed...