The Central Decatur Community High School underwent a renovation project to repair distress in the building caused by settlement. Differential...
1-844-225-3917
The Central Decatur Community High School underwent a renovation project to repair distress in the building caused by settlement. Differential...
The Abraham Lincoln High School was built in 1960 with construction consisting of poured concrete foundations, steel framing and masonry...
A historic home built in the early 1900’s was experiencing both lateral and vertical movement as an adjacent 17-foot tall...
Chiller equipment was installed circa 2000 for a new middle school addition. The equipment was originally installed within a stand-alone,...
Shortly after construction began on a home on Big Floyd Lake, the builder began to observe early warning signs of...
A new single-story, slab-on-grade building was planned adjacent to the existing bank. When completed, banking operations would move to the...
The Crossing is a facility owned by The Wesley Foundation. In 2010, the building was to undergo a 1.6 million...
The Southeastern Public Service Authority (SPSA) Steam Plant is located along the Elizabeth River and adjacent to the Norfolk Naval...
The Boulder Rural Fire Department planned to renovate an older office building to serve as a fire station. The project...
The RTD Elati Light Rail Maintenance Facility project included the construction of a new rail car wash bay. The 120-foot...
The Davis Residence, built in 1999, is a two-story home with an unfinished walkout basement. When the Davis family considered...
An addition was planned for the existing Verizon Data Center building. The addition would be located within the paved area...