The two-story, wood-frame home was built in 1999. Light loads from the first floor construction were reportedly supported by the slab-on-grade...
1-866-375-9990
The two-story, wood-frame home was built in 1999. Light loads from the first floor construction were reportedly supported by the slab-on-grade...
A new single-story, slab-on-grade building was planned adjacent to the existing bank. When completed, banking operations would move to the...
A new 379,800 sq. ft. warehouse was proposed on a site that had been previously used to dispose of mine waste...
The original tieback system for two intersecting, perpendicular 15-foot high (above mudline) bulkhead seawalls constructed in the 1950s had begun to...
A 20-foot by 45-foot, slab-on-grade, single-story equipment building had settled differentially at one end. Building construction consisted of shallow continuous wall footings,...
A slab-on-grade building addition was planned along the south and east sides of an existing school gymnasium. The gymnasium had experienced...
A 4,000 square-foot family cottage was planned for a lakefront property. A geotechnical investigation identified a general soil profile consisting of...
An equipment addition was planned within a three-story, steel foundry building. The equipment would be supported on four columns with an...
Two overhead cranes and 12 heavy equipment additions were planned within two 120 feet by 205 feet, slab-on-grade buildings at a...
The Cass Lake Clinic expansion consisted of an approximate 25,400 square foot addition to the existing hospital/clinic building. The project required...
An addition with a basement level was planned for the hospital. The existing exterior foundation walls adjacent to the addition would...
The local ABC affiliate, KETV, acquired the historic Burlington Train Station to be remodeled as a broadcast and web-media facility....