![Tower Crane Foundation](https://cdn.treehouseinternetgroup.com/uploads/case_studies/small/1401304005_8629.jpg)
Saint Alexius Hospital planned several building improvements including the placement of large mechanical equipment on the roof of a four-story wing....
1-866-375-9990
Saint Alexius Hospital planned several building improvements including the placement of large mechanical equipment on the roof of a four-story wing....
The project site is a former coal fired power station being renovated to receive crude oil delivered by rail from North...
A designer beach house conceptualized in 1934 by French architect, Charlotte Perriand, was planned for construction and temporary display outside the...
The two-story, wood-frame home was built in 1999. Light loads from the first floor construction were reportedly supported by the slab-on-grade...
A new single-story, slab-on-grade building was planned adjacent to the existing bank.When completed, banking operations would move to the new...
A new 379,800 sq. ft. warehouse was proposed on a site that had been previously used to dispose of mine waste...
A 20-foot by 45-foot, slab-on-grade, single-story equipment building had settled differentially at one end. Building construction consisted of shallow continuous wall footings,...
A slab-on-grade building addition was planned along the south and east sides of an existing school gymnasium. The gymnasium had experienced...
A 4,000 square-foot family cottage was planned for a lakefront property. A geotechnical investigation identified a general soil profile consisting of...
An equipment addition was planned within a three-story, steel foundry building. The equipment would be supported on four columns with an...
Two overhead cranes and 12 heavy equipment additions were planned within two 120 feet by 205 feet, slab-on-grade buildings at a...
An addition with a basement level was planned for the hospital. The existing exterior foundation walls adjacent to the addition would...