The Eastbay headquarters building in Wausau, Wisconsin had been experiencing differential settlement for many years. An area of particular concern was...
1-866-375-9990
The Eastbay headquarters building in Wausau, Wisconsin had been experiencing differential settlement for many years. An area of particular concern was...
The Eastbay headquarters building in Wausau, Wisconsin experienced differential settlement of the interior floor slab with measured slab movement as much...
Palmer College of Chiropractic planned an elevator addition to the outside of an existing building near the location where two "wings"...
Within the first six months of construction, the northwest corner of a 1,600 square-foot winery settled approximately 3.5 inches. The area...
A 20 foot by 40 foot in-ground swimming pool with surrounding concrete deck was planned. The pool would have a sloped...
An elevator addition was planned within the original Wilson Middle School building constructed in 1933. A soil boring completed outside the...
CSL Plasma planned renovations to a vacant end unit of a strip mall. The rear left corner of the unit had...
The 11-story Fleming Building in downtown Des Moines was built in 1909. The low rise building was constructed as a...
The condominium complex had a large trash compactor enclosed by three concrete block retaining walls and an access gate. The enclosure...
Saint Alexius Hospital planned several building improvements including the placement of large mechanical equipment on the roof of a four-story...
The project site is a former coal fired power station being renovated to receive crude oil delivered by rail from North...
A designer beach house conceptualized in 1934 by French architect, Charlotte Perriand, was planned for construction and temporary display outside the...