Six apartment buildings within the Royal Estates Apartment Complex were experiencing differential settlement, with measured movements as much as four...
1-866-375-9990
Six apartment buildings within the Royal Estates Apartment Complex were experiencing differential settlement, with measured movements as much as four...
A long strip footing was constructed on an adjacent lot approximately six feet away from the west exterior wall of...
An approximate 510 square meter (55,000 square foot) building addition was proposed to create a ground floor for the southern...
A slab-on-grade, steel-framed addition was proposed for the Moss Performing Arts Center at Colorado Mesa University. Previous subsurface explorations completed...
Voids were suspected beneath areas of Casio America, Inc.'s concrete slab-on-grade warehouse floor. The voids caused rocking in slab sections and...
The Eastbay headquarters building in Wausau, Wisconsin had been experiencing differential settlement for many years. An area of particular concern was...
The Eastbay headquarters building in Wausau, Wisconsin experienced differential settlement of the interior floor slab with measured slab movement as much...
Palmer College of Chiropractic planned an elevator addition to the outside of an existing building near the location where two "wings"...
Within the first six months of construction, the northwest corner of a 1,600 square-foot winery settled approximately 3.5 inches. The area...
A 20 foot by 40 foot in-ground swimming pool with surrounding concrete deck was planned. The pool would have a sloped...
An elevator addition was planned within the original Wilson Middle School building constructed in 1933. A soil boring completed outside the...
CSL Plasma planned renovations to a vacant end unit of a strip mall. The rear left corner of the unit had...