
The Eastbay headquarters building in Wausau, Wisconsin experienced differential settlement of the interior floor slab with measured slab movement as much...
1-866-375-9990
The Eastbay headquarters building in Wausau, Wisconsin experienced differential settlement of the interior floor slab with measured slab movement as much...
Within the first six months of construction, the northwest corner of a 1,600 square-foot winery settled approximately 3.5 inches. The area...
A 20 foot by 40 foot in-ground swimming pool with surrounding concrete deck was planned. The pool would have a sloped...
An elevator addition was planned within the original Wilson Middle School building constructed in 1933. A soil boring completed outside the...
CSL Plasma planned renovations to a vacant end unit of a strip mall. The rear left corner of the unit had...
The 11-story Fleming Building in downtown Des Moines was built in 1909. The lowrise building was constructed as a steel rigid...
The condominium complex had a large trash compactor enclosed by three concrete block retaining walls and an access gate. The enclosure...
Saint Alexius Hospital planned several building improvements including the placement of large mechanical equipment on the roof of a four-story wing....
The project site is a former coal fired power station being renovated to receive crude oil delivered by rail from North...
A designer beach house conceptualized in 1934 by French architect, Charlotte Perriand, was planned for construction and temporary display outside the...
The two-story, wood-frame home was built in 1999. Light loads from the first floor construction were reportedly supported by the slab-on-grade...
A new single-story, slab-on-grade building was planned adjacent to the existing bank.When completed, banking operations would move to the new...