The Kingsmill Resort planned to remove the existing one-story marina and restaurant building and replace it with a new two-story...
1-866-375-9990
The Kingsmill Resort planned to remove the existing one-story marina and restaurant building and replace it with a new two-story...
A local hospital planned to add a new computed tomography (CT) scanner to the radiology department. A 9-foot by 48-foot...
Chiller equipment was installed circa 2000 for a new middle school addition. The equipment was originally installed within a stand-alone,...
A new Citizens First Credit Union was to be constructed across two previously developed properties with existing structures. The existing...
The original school building for Our Lady of Lourdes Central Catholic School was constructed in 1951. Plans for a new...
The original school building and gymnasium on the Browne Education Campus were constructed around 1920. The north and west walls...
Renovations were planned for a circa 1920s, two-story building in downtown Portland. The project involved adding a third story to...
The Naval Air Station Pensacola planned to install a new jib crane for an existing indoor pool facility. The foundation...
A 15-foot by 95-foot area of the existing single-story, slab-on-grade building was experiencing differential settlement of the interior floor slab...
The Washington National Airport was opened in 1941 and renamed as the Ronald Reagan Washington National Airport in 1998. Renovations...
A new boat dock was planned along the shoreline of a small manmade lake that formed within the limits of...
A new 250-foot long gabion basket retaining wall was proposed along a wooded hillside. The retaining wall would support excavations...