December 2009 Shortly after construction began on a home on Big Floyd Lake, the builder began to observe early warning...
1-844-225-3917
December 2009 Shortly after construction began on a home on Big Floyd Lake, the builder began to observe early warning...
September 2010- The proposed site for the new Knoxville Zoo Lion and Baboon Exhibit was within a previously developed area...
March 2010- In 2010, Keller, Inc. began construction of a free stall milking complex designed to handle up to 380...
November 2009- Construction details for the new Culver’s restaurant included an 8-inch-thick poured concrete foundation wall, steel framing and anchored...
A new boat dock was planned along the shoreline of a small manmade lake that formed within the limits of...
A beach (at grade) boardwalk was proposed at Gray’s Lake Park within the area between the Raccoon River and Gray’s...
CSL Plasma planned renovations to a vacant end unit of a strip mall. The rear left corner of the unit had...
The 11-story Fleming Building in downtown Des Moines was built in 1909. The lowrise building was constructed as a steel rigid...
A slab-on-grade building addition was planned along the south and east sides of an existing school gymnasium. The gymnasium had experienced...
A 4,000 square-foot family cottage was planned for a lakefront property. A geotechnical investigation identified a general soil profile consisting of...
An equipment addition was planned within a three-story, steel foundry building. The equipment would be supported on four columns with an...
Two overhead cranes and 12 heavy equipment additions were planned within two 120 feet by 205 feet, slab-on-grade buildings at a...