Renovations to the Pasco County School District Offices included an interior elevator addition within one of the existing buildings. The...
1-844-225-3917
Renovations to the Pasco County School District Offices included an interior elevator addition within one of the existing buildings. The...
The Science Museum of Virginia planned to open a new permanent exhibit called “Speed”. The centerpiece of this exhibit would...
May 2015 -- During a large flood event in downtown Cedar Rapids, an underground diesel storage tank was compromised and...
I.E.I. Barge Services planned for a new overhead conveyor system to extend from a proposed rail/truck receiving pit to two...
January 2016 -- Florida State University planned to enclose the south end of Doak Campbell Stadium to create the Champions...
A proposed environmental treatment plant would include two main structures with building footprints of 1,980 and 3,200 square feet. The...
After the 2008 flood events in eastern Iowa, the Federal Emergency Management Agency (FEMA) reevaluated the 100 and 500 year...
A sanitary sewer forcemain was planned along an existing roadway. A 280 meter long section of the forcemain would include...
The renovation of a 15,000-square-foot building was planned at the Bowe Machine facility. New foundations were required at 39 new...
Two new, independent sections of stormwater outfall sewers were proposed through a flood mitigation levee along the east bank of...
An abandoned gas station built in the 1950s was being remodeled into a bakery. The general contractor found the original building...
April 2015 -- When the original, two-lane, trestle bridge experienced washout, it was replaced with multiple culverts covered with rock...