The “Villages of Twin Oaks” development project was planned southeast of the Big Bend Road and Missouri State Route 141...
1-844-225-3917
The “Villages of Twin Oaks” development project was planned southeast of the Big Bend Road and Missouri State Route 141...
The STEAM (Science, Technology, Engineering, Art and Math) Elementary School building, originally built in 1967, was planned to receive upgrades...
Additions planned for an existing manufacturing facility included a large furnace and a 30-ton crane. Each addition would require its...
An area of land near a major interstate was under development with multiple buildings being constructed. The construction would also...
The Hickey Elementary School building was constructed in 1965. An elevator addition was planned for the school to comply with...
A local automotive parts distributor planned to have a new 113,000-square foot distribution warehouse built. The proposed metal building would...
Menard Hall on the Lincoln Land Community College campus is a two-story structure with offices, classrooms, and student dining. Renovations...
A second level was planned for an existing one-story building. It was determined the second story addition would overload four...
A CMU-block retaining wall at Schooner Cove Condominiums ran along a canal seawall to support a section of elevated pool...
The back wall of a 100-foot-long, single-story building had differentially settled one inch toward one of the rear corners. The...
An elevated beach house built in 1949 was supported on timber pilings with wood cross bracing. Partial deterioration of the...
A swimming pool was planned behind a bayside home that was still under construction. The cinderblock and wood framework of...